A Rowan company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows

Cost to Hire a General Contractor in Fort Worth - Written Fixed-Price Quotes, Permits Handled

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What It Costs to Hire a General Contractor in Fort Worth, TX

Hiring a general contractor in Fort Worth usually runs 10% to 20% of total project cost as a management fee, but that percentage is not the number that decides your final bill. The real swing factor is change orders. A $120,000 kitchen with 20% undocumented scope creep closes out at $144,000, and the GC fee you compared so carefully explains none of it. Call (833) 570-6084 and we’ll put a written price in front of you before anyone touches a tool: a fixed scope, named brands, and a signed change-order rule that has kept our projects within a few percent of the agreed number.

Rowan Construction Group Fort Worth works under what we call The Haven Standard, a written set of rules we build to on every job. Clause 1 is simple: the price is written before anyone starts. That single discipline is why the estimate you hold at the beginning is close to the invoice you pay at the end.

A second-story addition that matches the existing roofline

What a 15% Contractor Fee Actually Buys

When a Fort Worth contractor quotes a management fee, that percentage has to cover several real costs. It helps to see where the money goes, because the line items tell you which bids are honest and which are thin.

  • Overhead. Insurance, licensing, office time, and the software that tracks your schedule and budget.
  • Profit margin. Typically 8% to 12% of the fee. A GC who quotes 5% is usually planning to make it back in change orders.
  • General liability and workers’ compensation. Real coverage costs real money. A cheap bid often leaves a subcontractor’s uninsured crew on your job.
  • Permitting coordination. Submittals, inspections, and the back-and-forth with the city that eats hours nobody sees.
  • Schedule and trade management. Sequencing carpenters, plumbers, and electricians so the drywall doesn’t go up before the rough-in is signed off.

What a percentage can hide is the padding. A GC who knows the quote will grow doesn’t need an accurate first number. A GC who has signed off on a fixed scope does.

The Fort Worth Permit Reality That Cheap Bids Skip

Fort Worth runs construction permits on two tracks, and the difference adds real coordination hours to any project in the older core. Most of the city goes through the standard City of Fort Worth permit process: plan review, inspections, a certificate of occupancy at the end.

Then there’s the Historic and Cultural Landmarks Commission. If your project is a century-old bungalow in Fairmount or the Near Southside, any front-facing change or addition has to clear design review before you can pull the permit. That’s a separate meeting calendar, a separate set of drawings, and weeks of lead time a low bid never budgets for. In Fairmount, a rear addition with matching siding can move faster than a front-porch change that touches the streetscape. Knowing which door you walk through first is the kind of thing a Fort Worth contractor should tell you on day one.

North and west of the core, the work looks nothing like that. The slab-on-grade brick homes spreading toward Alliance and Walsh Ranch fall under current energy code and evolving platting rules, which means different inspections and a different set of trades on the schedule. A contractor fluent in only one world will either overbid the other or miss something that turns into a change order.

A framer checking new wall framing on a home addition

Why Change-Order Drift Costs More Than the Fee

Here’s the math most contractor-fee comparisons never run. A $120,000 remodel with 20% undocumented scope creep closes at $144,000. The same job with a 12% fee and zero drift closes at $134,400. The “cheaper” percentage lost by nearly $10,000 because nobody controlled the changes.

At Rowan, no work proceeds on a change until the change order is signed. That rule is administrative, not glamorous, and it’s the reason we’ve kept projects within a few percent of the agreed cost across 4,000-plus jobs since 2007. Every change gets a written price and a signature before a tool moves. You always know what you’re approving and what it costs.

One Fort Worth pressure point deserves its own paragraph. The expansive Blackland clay under much of the city swells and shrinks with the wet-dry cycle, and a plain slab will crack as the clay heaves. Soil prep and post-tension foundation work are non-negotiable line items on anything with a footprint. A low-bid GC who leaves them out of the initial quote looks cheaper for a few weeks, then adds them back as a change order after you’ve signed. Ask any Fort Worth bid whether foundation prep is in the number or waiting to be discovered.

Real Project Ranges in Fort Worth, Before the Contractor Fee

These are the construction numbers our written quotes build on, so you can see the base scope separate from management. Add 10% to 20% for the contractor’s fee, and you have a realistic total to compare against any bid.

Project Typical Fort Worth Range
Kitchen Remodel $14,000-$45,000
Bathroom Remodel $9,000-$28,000
Home Addition $45,000-$130,000
ADU Construction $90,000-$220,000
Roof Replacement $8,000-$20,000
Window Replacement $4,500-$15,000
Paver Driveway Installation $7,000-$18,000
Vinyl Fence Installation $3,500-$9,000

For a smaller project, a small kitchen remodel runs $9,000-$20,000 and a tub-to-shower conversion runs $3,500-$10,000, both before the fee. The ranges are wide because finish choices move the number more than labor does. That’s why the written quote names brands instead of describing them. A quote that lists KraftMaid or Wellborn cabinets and Cambria or Caesarstone counters gives you honest numbers you can check, not a range that expands at delivery.

What “Written Upfront Pricing” Includes at Rowan

We mean four specific things when we say the price is written before work starts, and you can hold us to each one.

  • A fixed scope document. The written scope names what’s included and, just as important, what isn’t.
  • Named material brands. KraftMaid and Wellborn cabinets, GAF and Owens Corning roofing, Kohler fixtures, Belgard pavers. No mystery substitutions.
  • The 365-Day Done Right Promise. If it isn’t done right, we make it right, backed by a terms page, not an asterisk.
  • A documented photo record. Every visit ends with photos of what we found and what we did, included as standard. Our background-checked technicians leave you with evidence, not a verbal summary.

We also offer a Free Second Opinion on any written estimate. Bring a competitor’s quote and we’ll review it line by line at no charge, whether or not you hire us. Alongside it, our technicians have up to 19 years of experience, and a live person answers our phones 24/7. Our home page shows how all seven trades connect under the same written-price rule.

FAQs

What Our Customers Say

★★★★★ 4.8 from 6+ reviews

"Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."

- Malcolm T.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."

- Iona F.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Fort Worth? Licensed & insured · free written estimates
Call (833) 570-6084

Request a Free Estimate

Tell us what's going on in Fort Worth. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch