







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Keller
If you’re adding a room, a second story, or a detached ADU on a Keller lot, the job will be decided twice: once at the drawing board and once at the city’s architectural review. We plan for both. Keller is a built-out suburb, so most of the work here is an addition on a 1980s or 1990s brick ranch, a garage conversion, or a new detached unit in one of the last open pockets – not new construction on raw land. Our technicians bring up to 19 years of experience, and every project gets a written flat price before anyone touches the lot. Call (833) 570-6084 to schedule your free estimate.
Why Rowan Construction Group Fort Worth Is Keller’s Preferred Home Additions & ADU Company

We know Keller because we work in it constantly – the 76248 core, the northern 76244 growth areas, the streets off Keller Parkway and Rufe Snow. That matters for additions and ADUs more than for any other trade, because Keller reviews the look of the structure, not just its safety. Materials, roof pitch, and height have to match the neighborhood, and the packet has to prove it. We prepare and file that packet as part of the scope, so the review isn’t a surprise you discover after framing starts.
Under Clause 1 of The Haven Standard, the price is written before anyone starts, and no change proceeds without a signed change order. That discipline is why our projects finish within a few percent of the agreed cost, which matters when a review cycle adds weeks to the calendar. We also offer a free second opinion on any written estimate – bring a competitor’s quote and we’ll review it line by line at no charge. If you’re comparing us against other contractors in Keller, ask each one who files the architectural submittal and who pays for a second review cycle. The answer tells you a lot.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Keller
ADU Design & Permitting
Keller’s architectural review is where ADU projects stall, so we treat the submittal as part of the design, not paperwork afterward. The packet needs masonry samples that match the 1980s-1990s ranch stock, height elevations, roof pitch, and a site plan that respects existing setbacks on a lot that may already be tight. We draft, file, and track it through the review cycle so you’re not the one fielding comments from the committee.

Garage Conversion ADU
A garage conversion is often the cleanest ADU path on a built-out Keller lot, because the footprint, slab, and roof already exist. The work is in the details: insulation, egress, plumbing for a kitchenette or bath, and matching the exterior finish so the conversion doesn’t read as an afterthought. In the 76248 core we check the existing slab first – if the clay has moved it, the conversion budget needs to account for that before drywall goes up.

New Detached ADU
A new detached ADU in Keller usually lands on one of the last open side yards, and the build has to be engineered for Blackland Prairie clay from the start. That means piers or a post-tension slab under the new load-bearing walls, not a standard slab poured on faith. We sequence foundation and framing around the approval date so an open shell isn’t sitting exposed through North Texas hail season.

Junior ADU & Interior Conversion
Not every Keller household needs a separate structure. A junior ADU carved out of an existing footprint – a converted den, an attached suite, a reworked interior – keeps the project inside the walls and often sidesteps the heaviest review requirements. We confirm egress, ceiling height, and separation from the main living space before pricing, so the number you get is the number that passes inspection.
These are the four we build most in Keller, but our Home Additions & ADU team also handles room additions, second story additions, sunrooms, and enclosed patios. Room additions and second stories carry the same engineering question here: whether the existing foundation can take the new load, or whether it needs piers first.
Trusted Brands We Service in Keller
Materials are where a Keller submittal packet gets its evidence. When a review asks for masonry that matches the original house, we specify brands we can document rather than describe: Cambridge Pavers for hardscape around a new addition, Oldcastle and Quikrete for the concrete and masonry base work, Sakrete for the site-prep pours. We don’t stock parts locally – each material is sourced per job against the written scope, so the quote reflects real product prices instead of a padded allowance. That’s the same sourcing discipline we apply across seven trades, and it’s how a written price stays honest through a review cycle.
Common Home Additions & ADU Problems We See in Keller Homes
- A submittal that triggers a second review cycle. Packets that go in without masonry samples or height elevations matching the 76248 ranch character come back with comments, and each cycle pushes the draw schedule. We file the complete packet the first time.
- Framing on a slab that has already moved. Expansive Blackland Prairie clay heaves and settles seasonally, and an addition framed over a slab that’s already shifted cracks drywall and fails punch-list sign-off. A foundation inspection comes before the framing, not after.
- Rough-in and foundation work started before approval. When the footing and framing go in ahead of architectural approval, the shell sits open through spring hail and rain while the committee reviews. We sequence framing and rough-in to wait for approval.
- Second stories that load an unreinforced slab. Older Keller homes weren’t built for a second floor, and the added load on clay needs piers or a reinforced design before the stair goes in.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Keller, TX

Here’s what additions and ADUs run in Keller, quoted as flat written prices with a written scope and warranty. The range reflects footprint, foundation work needed for clay, finish level, and how much review the design draws – a brick-matching packet often costs more engineering time than a simple interior conversion.
| Project | Typical Keller Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Foundation piers, masonry matching, and a second review cycle are the three items that move the number most in Keller. We itemize them in the written quote so you can see what’s driving the range. Call (833) 570-6084 for an exact quote – estimates are free, and you get the number in writing before any work starts.
We Also Serve Cities Near Keller
We take the same architectural-review discipline to the towns around Keller – Watauga, North Richland Hills, Southlake, and Colleyville, each with its own review standards and clay-soil engineering. If you’re just outside the Keller line, the process is familiar. See what we do in Keller for the full picture, then call to talk about your lot.
Serving Keller, TX – Our Local Coverage Area
We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Keller

A Keller review typically adds several weeks to the front of the schedule, and longer if the packet comes back with comments. We build that window into the calendar before we price the job, so the framed shell isn’t sitting open while the committee decides. Call (833) 570-6084 for a timeline built around your lot.
Yes, in most cases – the age of the house isn’t the barrier, the lot and the design are. Keller’s built-out 76248 core often has tight setbacks, so the ADU has to fit within them and match the brick and roof pitch of the original home. A garage conversion is often the simpler path. Call (833) 570-6084 and we’ll assess your lot for free.
Yes, and it’s the biggest engineering difference in Keller. A new build designs its foundation for the clay from a clean start; an addition has to work with an existing slab that may already have heaved or settled, so piers or a reinforced design are common. We inspect the existing foundation before framing. Call (833) 570-6084 to schedule that inspection with your estimate.
We do – drafting, filing, and tracking the submittal is part of our scope, not yours. The packet includes masonry samples, height elevations, roof pitch, and a site plan that respects setbacks, prepared to the review’s standards the first time. You don’t field the committee’s comments. Call (833) 570-6084 to get started.
You’ll get a written change order with the exact material difference and cost before any of that work proceeds – nothing moves until you sign it. That’s the discipline behind The Haven Standard: no change without a signed order, which is why our projects finish within a few percent of the agreed price. Call (833) 570-6084 with your design and we’ll walk you through the likely review asks.
Get Your Keller Addition or ADU Priced in Writing
Whether it’s a rear addition on a 1980s ranch, a second story, or a detached ADU in 76244, the job starts with a foundation check and a review-ready packet – and a flat written price before anyone picks up a tool. Our technicians bring up to 19 years of experience, our crews are background-checked and uniformed, and a live person answers calls 24/7. Call (833) 570-6084 to schedule your free estimate in Keller.
Written by the team at Rowan Construction Group.












