







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Bathroom Remodeling in Fort Worth, TX
A full bathroom remodel in Fort Worth typically runs $14,000 to $32,000 for a hall or guest bath and $28,000 to $65,000 for a primary suite, depending on whether the layout moves and how far the tile and fixture selections go. A full remodel means the room comes down to the studs: tub and shower out, vanity out, floor covering out, and everything from the shutoff valves to the exhaust fan reworked to current code. It’s the right scope when one or two problems have turned into four or five, and patching them one at a time costs more than doing the room once, correctly.
Rowan Construction Group Fort Worth handles full bathroom remodels as part of our Bathroom Remodeling work across Tarrant County. Under Clause 1 of The Haven Standard, you get a flat written price with a written scope before anyone picks up a tool. No “call for a quote,” no number that shifts once the drywall opens. Our technicians have up to 19 years of experience, are background-checked and uniformed, and arrive with a job number you can tie to the written estimate. To get a price started, call (833) 570-6084.
Key Takeaways
- Full remodel pricing in Fort Worth runs roughly $14,000 to $65,000 depending on room size, layout changes, and finish level.
- Gut remodels are the right scope when the plumbing, tile membrane, and electrical all need attention at once.
- You get a written price and written scope before work starts, and no change proceeds without a signed change order.
- Every visit includes a documented photo record, so you can see what the crew found behind the tile and under the floor.

When You Need Full Bathroom Remodeling
Fort Worth bathrooms show their age in specific, predictable ways. The city’s expansive clay soils shift with wet and dry cycles, and that movement shows up first in the small rooms with heavy tile: hairline cracks at the shower curb, grout lines that keep opening, a floor tile that rocks underfoot. Add the summer heat and a 1950s or 1970s house’s original cast-iron drain lines, and you get rooms where the cosmetic problem and the structural problem arrive together. Here are the scenarios that point to a full remodel rather than a repair.
- The shower or tub surround has failed. If caulk and grout lines keep returning to black, or the tile feels loose when you press on it, the waterproofing membrane behind it has likely failed. In Fort Worth’s older homes, we regularly find greenboard instead of cement board behind a 1990s tile job, which means the whole surround comes down.
- The room is functionally wrong. A hall bath that only fits a 30-inch tub, a doorway that won’t clear a walker, a vanity with no usable counter, or a toilet that crowds the shower – these are layout problems a refacing job can’t solve.
- You’re down to one bathroom and need to add one. Converting a closet, adding a second bath, or reworking an awkward primary suite usually means moving drain lines, which is full-remodel territory.
- Plumbing and electrical are original. Galvanized supply lines, a single ungrounded outlet, or a fan vented into the attic rather than outside – if any of these show up, correcting them requires opening the walls.
- A prior remodel is hiding problems. We see this often in Fort Worth homes flipped between 2015 and 2022: tile laid over tile, a vanity screwed to drywall with no blocking, a shower pan built without a proper slope. A full remodel resets the room to a known condition.
Our Full Bathroom Remodeling Process
The order of work matters as much as the work itself. Doing the sequence out of order is how a full remodel ends up over budget and three weeks behind. Here’s how we run a full bathroom remodel in Fort Worth, step by step.
- Walk-through and measurement. We measure the room, note the condition of the substrate, plumbing, and wiring, and identify what needs to change to meet current plumbing and electrical code. You get a written scope and a flat written price before anything moves.
- Demolition and documentation. The room comes down to the studs. We photograph what we find – the framing, the drain lines, the subfloor, any hidden water damage – and the photo record goes into your file. If the scope has to change because of what’s behind the wall, you get a written change order and no work proceeds until it’s signed.
- Rough-in. New supply and drain lines, electrical brought up to code (GFCI protection, a properly sized circuit for the fan and vanity lighting), and the exhaust fan vented to the outside rather than into the attic. This is where the tile membrane goes in: a cement board or foam board substrate, waterproofed with a roll-on or sheet membrane, with the pan sloped correctly.
- Tile and finishes. Floor tile, shower and tub surround, then the fixtures – Kohler or Toto for the toilet and sink, KraftMaid or Wellborn for the vanity cabinetry, Cambria or Caesarstone for the countertop if you’re going with stone. We set and grout in one pass so the lines line up.
- Install and punch list. Toilet, vanity, faucets, shower trim, mirror, lighting, and any accessories go in. We walk the room with you, list anything that needs attention, and correct it before the final invoice.
- Final documentation. You get the photo record, the written warranty, and the signed change orders in one file. Under Clause 1, the price you agreed to is the price you pay.
For the material and finish side of a full remodel in more detail, see our Bathroom Remodeling in Fort Worth page, which covers the choices we source from our fifty-plus vetted brands.

Full Bathroom Remodeling Pricing in Fort Worth
Bathroom remodel costs in Fort Worth land in a wide range because the room is small and the variables are big: a hall bath that keeps its footprint is a fundamentally different job from a primary suite that moves the shower and adds a second sink. Here’s the honest line-item range, in dollars, so you can compare before you call.
| Scope | Typical Fort Worth range | What drives the number |
|---|---|---|
| Hall or guest bath, layout kept | $14,000 – $26,000 | Tile area, vanity and fixture tier, whether the tub is replaced or refinished |
| Hall bath with layout change | $24,000 – $40,000 | Moving the drain, adding a second sink, relocating the toilet |
| Primary suite, layout kept | $28,000 – $48,000 | Double vanity, walk-in shower, freestanding tub or tub-and-shower combo |
| Primary suite, layout change or added bath | $42,000 – $65,000+ | Moving plumbing walls, adding a closet, new exterior wall, code upgrades |
| Tile and finish upgrades (allowance over base) | $2,000 – $15,000 | Natural stone, large-format tile, frameless glass, heated floor |
What moves the price up: moving the drain line (the single biggest cost jump in a bathroom), adding a second sink or extending a wall, selecting natural stone tile that requires a different substrate, and upgrading to a frameless glass enclosure or heated floor. What keeps it down: keeping the toilet and shower drain where they are, choosing a 60-inch tub-and-shower combo over a walk-in shower, and staying with a standard vanity width from KraftMaid or Wellborn rather than going fully custom.
Every Rowan quote is a flat written price with a written scope and a written warranty. If a competitor has given you a written estimate, we’ll review it line by line at no charge as a free second opinion – useful when two quotes for “full bathroom remodel” come back $18,000 apart and you want to know why. Estimates are free. Call (833) 570-6084.
What Affects the Cost Most in Fort Worth Homes
Three things move a Fort Worth bathroom remodel farther than anything else. First, the condition of the drain lines. In older neighborhoods – Ryan Place, Mistletoe Heights, the Near Southside – we find cast iron and galvanized lines that have scaled shut, and replacing them adds to the job. Second, the subfloor. Fort Worth’s clay soil shifts, and we sometimes find a subfloor that’s out of level by more than a quarter-inch over the room, which means leveling before tile goes down. Third, whether the room was previously remodeled over the top of a bad job, which usually means stripping back further than expected.
None of these are surprises in this market. We write what we find into the scope, document it in the photo record, and if it wasn’t in the original scope, the change order process keeps the number honest.
Why Rowan Construction Group Fort Worth
We started in 2007 and have delivered more than 4,000 projects since, every one with a written price before work started and a documented record when the crew left. That discipline is what the Haven Standard is built around: Clause 1 says the price is written before anyone starts, and no change proceeds without a signed change order. That’s why projects finish within a few percent of the number you agreed to, not 20 percent over it.
The 365-Day Done Right Promise backs every full bathroom remodel: if it isn’t done right, we make it right within the year. A live person answers calls 24/7, and the crew that arrives is background-checked, uniformed, and carries a photo record of the visit as standard. You can request our license number and it will appear on your written estimate. If you want a clear picture of what the full room costs before you commit, our team will walk you through home renovation options as well, since a full bath often touches the hallway, laundry, or adjacent bedroom.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in Fort Worth?
A full bathroom remodel in Fort Worth typically costs $14,000 to $32,000 for a hall or guest bath and $28,000 to $65,000 for a primary suite, depending on layout changes and finish level. Moving a drain, adding a second sink, or going with natural stone pushes the number toward the top of that range. Call (833) 570-6084 for an exact written quote – the estimate is free and the price is put in writing before any work starts.
Can you fix a full bathroom remodel the same day?
No – a full bathroom remodel is a multi-week job, not a same-day repair. A hall bath typically takes two to four weeks of working time and a primary suite three to six weeks, depending on tile lead times and inspections. What you can get same-day is a written estimate and a clear schedule. Call (833) 570-6084 to book the walk-through.
Is it cheaper to repair my bathroom or do a full remodel?
It depends on how many systems have failed. If the leak is isolated, a repair is cheaper. If the shower membrane has failed, the plumbing is original, and the electrical is out of code, a full remodel is usually the lower total cost because you stop paying for repeat repairs. The break-even point is roughly when two or more of those problems overlap. Call (833) 570-6084 and we’ll give you a written comparison of both paths.
Do I need a permit for a full bathroom remodel in Fort Worth?
Yes – a full remodel that moves plumbing, adds or relocates a fixture, or changes the electrical usually requires a permit through the City of Fort Worth’s development services department, with inspections at rough-in and final. We handle the permit pull and coordinate the inspections as part of the written scope. If you’re unsure whether your job triggers a permit, call (833) 570-6084 and we’ll tell you in one conversation.
What brands and materials do you use for a full bathroom remodel?
We source from fifty-plus vetted brands and give you a written lineup before demolition. For bathroom work that means KraftMaid or Wellborn for the vanity cabinetry, Kohler or Toto for the toilet and sink, Cambria or Caesarstone for the countertop if you’re going with stone, and a waterproofing membrane system behind every tile. Our technicians have up to 19 years of experience with these products. Call (833) 570-6084 and we’ll walk you through the options that fit your budget.
Get a Written Price for Your Fort Worth Bathroom
A full bathroom remodel is a decision you want to make with the number in front of you, not a promise on the phone. Rowan Construction Group Fort Worth gives you a flat written price with a written scope and written warranty before anyone enters your home, and every change gets a signed change order before it happens. Call (833) 570-6084 for a free estimate – a live person answers 24/7, and you’ll have photos, a schedule, and a price you can compare before you commit.
Written by the team at Rowan Construction Group Fort Worth, serving Fort Worth.


